Home > Performance > Steel Structure

 

Total 36 [ Current Page 1 / 9 ]

No Owner Clients Prime Vendor Period Image
36 Samsung Electronics Co., Ltd. Samsung C&T Gaya ESC/Haeseong/Daeheung/Younghwa/SEN Core Tech Etc. Aug.2012~Mar.2014

Project Name : Inspection Service for Steel Structure of Samsung Electronics Whaseong Factory(S3 Project)
Main Particulars; Total Steel Weight : 44,414 Ton, Location : Dongtan-eup, Whaseong city, Gyeonggi-do,   Building Scale: 231m x 186m, Architecture Area 4,455,000, Total Floor Area 418,846㎡, Stories : Office Building(B1F & 31F), Dining Hall(3F), Fab. Building(7F), Support Building(7F),   
Manufactures; Gaya ESC/South & West  Support Building 8,650 Ton, Haeseong /North &  West  Support Building 8,650 Ton, Daeheung/Office Building 11,720Ton, Youngwha/Fab. Building 14,690Ton, Sen Core Tech(PSRC) 704 Ton, Chungju Samsung PC Factory

35 Korea Southern Power Co., Ltd. GS E&C Hanmac Heavy Ind., Samjin Plantec, Sejin Valve, SaehanTravis, Hyosung Good Springs, LS Cable, GnC, Hanshin Mach. Etc. Apr. 2012.4 ~ Mar. 2014

Project Name :  Inspection Service for key Components of Andong Combined Cycle Power Plant

Main Particulars : Capacity(400MW x 1 Unit), Location(Gyeongbuk Bio Industry, Plant Area 84,853)

Inspection Duration(Apr. 2012.4 ~ Mar. 2014)

Inspection Items : Cooling Tower, Pump, Motor, Reducer, Shaft, C.W.Pipe, Steel Structure, Diesel Generator, Gantry Crane, Overhead Cranes, Lighting, Laboratory Equipment, Electric Panel, Transformer, LV Switchgear, Motor Control Center, Butterfly Valve(1200A), Elevator, Rubber Expansion Joint, Cable, Air Dryer Etc.


34 SBI(USA) VSL(China) Ajoo Besteel(Pohang) Apr. 2012 ~ Sep. 2012

Project Name :  Manufacturing Inspection Service for SBI API Green Pipe

Main Particulars : Applied Code(API 5CT), Inspection Place(Ajoo Bestel, Pohang)

Inspection Items(Material Test, Chemical Analysis, Dimension Inspection(Straight, Hooked End, Spiral, OD, Ovality,Wall Thickness, Full Length), Heat Treatment, Full Body UT, Weld Line UT, Drift Test(Dim,)Hydraulic Test, Painting/ Marking Inspection, Packing, Visual, Etc.), Qt’y(18 kinds including 7"x 0.408(P110) 1011 Pcs.)

33 Korea Southern Power Co., Ltd. Hyundai E&C ST Co., Ltd. June 2013 ~ Feb. 2014

project Name : Inspection Service of Steel Structure for Samcheok Green Power
Main Particulars : Total weight 6,162Ton, 2 Units of 500MW class CFBC Boiler


   1 2 3 4 5 6 7 8 9